According to the relevant requirements of the the People's Republic of China Environmental Impact Assessment Law (2018 edition), the Measures for Public Participation in Environmental Impact Assessment (Decree No. 4 of the Ministry of Ecology and Environment) and the Notice on Strengthening Public Participation and Supervision and Management of Environmental Impact Assessment of Construction Projects (Lu EIA Letter [2012] No. 138), public participation information is publicized for the environmental impact assessment of the 1500m ³ d Wastewater Treatment Expansion Project, make the public in the area that the project construction may affect understand the project construction situation, and understand the public's attitude and suggestions to the project through publicity, and accept the supervision of the public.
Basic situation and scale content of 1. construction project
Basic situation of (I) construction project
Project Name: 1500m ³ d Wastewater Treatment Expansion Project
Construction unit: Qilu Tianhe Huishi Pharmaceutical Co., Ltd.
Construction site: in the factory area of Qilu Pharmaceutical Dongjia Industrial Park, Dongjia Street, Licheng District, Jinan City
Nature of construction: reconstruction and expansion.
(II) project scale and content
The project covers an area of 9972.61 square meters, with an investment of 51.4993 million yuan. The design scale of wastewater treatment system is 1500 m3/d. The wastewater treatment is planned to adopt the process of "Pretreatment Secondary A/O MBR Ozone Catalytic Oxidation RO System Evaporation System". After treatment, the reclaimed water enters the existing 3000 m3/d reclaimed water reuse system, part of the clear water is recycled to the plant area, and part of the effluent is discharged into the sewage treatment plant of Lingang Development Zone through special pipelines for treatment, and finally into Xiaoqing River.
The construction content is mainly a comprehensive equipment room, which is a reinforced concrete frame structure with 3 floors above the ground and 1 floor below the ground. It covers an area of 4636.83 ㎡, and the total height is 18.6 meters. The total depth of the semi-underground pool is 7.5m, and the total construction area is 6986.82 ㎡ (excluding the semi-underground pool). The fire hazard in production shall be designed according to Class E and Class II fire resistance rating. Outdoor anaerobic reactor, biogas desulfurization device, acid-base storage tank, etc.
The sludge is dried at low temperature by means of a stacked screw dehydrator.
The construction of the project is in line with the relevant national industrial policies, and the project site is in line with local planning.
Name and contact information of 2. construction project unit and report preparation unit
Construction unit: Qilu Tianhe Huishi Pharmaceutical Co., Ltd.
Contact: Cao Lisheng
Contact number: 17753129935
Electronic E-mail: 1058291051@qq.com
The name of the preparation unit of the environmental impact report: Shandong Unate Environmental Technology Co., Ltd.
Working Procedures and Main Work Contents of 3. Environmental Impact Assessment
Environmental impact assessment is divided into three stages: preparation stage, evaluation stage and report preparation stage.
The main work contents include: regional environmental overview; environmental status investigation and evaluation; existing engineering analysis; analysis of proposed engineering; environmental impact prediction and evaluation (air, surface water, groundwater, noise, soil, solid waste, etc.); environmental impact evaluation, environmental risk impact evaluation, environmental protection measures and their technical and economic demonstration during the construction period; environmental economic loss analysis; environmental management and environmental monitoring plan; evaluation conclusions and suggestions, etc.
Scope and Main Matters of 4. Soliciting Public Participation
1. Scope of public participation opinions or suggestions:
Residents, relevant departments or enterprises around the project.
2. Main matters for public comments:
(1) Local socio-economic development;
(2) Major local environmental problems (water, atmosphere, noise, soil, solid waste, etc.);
(3) What are the suggestions or requirements for environmental protection during the construction and operation periods of the Project;
(4) What is the attitude towards the construction of the project; what are the requirements and suggestions for the evaluation unit and the construction unit, etc.
Main ways of 5. public participation
The public can submit the completed public opinion form (http://www.qilu-tianhe.com/) to the construction unit by letter, fax or e-mail to reflect their opinions and suggestions related to the environmental impact of the construction project. If you need to know more about the project, please contact the construction unit.
Deadline: within 10 working days from the date of announcement, if you have any comments, please report them to the construction unit in time.
Qilu Tianhe Huishi Pharmaceutical Co., Ltd.
2 July 2020
Annex 1
Form of Public Comments on Environmental Impact Assessment of Construction Projects
Date of filling in the form
| Project Name |
1500m ³ d wastewater treatment expansion project |
|
1. this page for public comment
|
| Suggestions and opinions related to the environmental impact and environmental protection measures of the Project (note: according to the provisions of the Measures for Public Participation in Environmental Impact Assessment, opinions or demands related to land acquisition, demolition, property, employment, etc., which are not related to the EIA of the Project, do not belong to the EIA of the Project) |
(Please do not involve state secrets, trade secrets, personal privacy and other contents when filling in this item. If this page is not enough, please attach another page.) |
| 2. this page for public information |
|
If the (I) public is a citizen, please fill in the following information
|
| Name |
|
| ID number |
|
|
Effective contact information(phone number or E-mail)
|
|
| Frequently Resident Address |
Villager groups (communities) of provinces, cities, counties (districts, cities), townships (towns, streets), villages (neighborhood committees) |
|
Whether to agree to disclose personal information(Consent or disagree)
|
(If not filled in, the default is not to agree to open) |
|
If the (II) public is a legal person or other organization, please fill in the following information
|
| Unit Name |
|
| Business registration number or unified social credit code |
|
|
Effective contact information(phone number or E-mail)
|
|
| Address |
Province, city, county (district, city), township (town, street) road number |
Note: The information of legal persons or other organizations can be disclosed in principle. If information that cannot be disclosed is involved, please indicate the legal basis and specific information that cannot be disclosed in this column.