Briefing on Emergency Exercise of Hazardous Waste Fire in 400 Workshop on April 30, 2021
Release time:
2021-09-02
In accordance with the requirements of environmental emergency plan filing regulations, 2021On April 30, 1993, the 400 workshop organized and carried out emergency drills for hazardous waste fire emergencies in the 403 section of the workshop in combination with the actual production of the workshop.
The hypothetical event of the drill is the smoke and fire of the rake dryer salt placed in the hazardous waste inventory in the workshop section, which will be disposed of immediately after inspection.
The content of the drill focuses on the information transmission in emergencies, the implementation of on-site disposal measures, the transfer of hazardous wastes, on-site vigilance, the allocation and deployment of emergency materials, and the environmental protection considerations in the whole process of disposal. The overall goal is to deal with the initial fire in time. Make the scene effectively controlled.
During the live exercise, the scene of the incident was immediately reported to the police (automatic control found that the waste salt was smoking, and the post was notified in time), and the site was disposed of in advance (the bag of waste salt was removed from the hazardous waste warehouse, and break), emergency start-up (key post personnel clearly graded start-up conditions and procedures), emergency resource mobilization (emergency materials are fully equipped and placed relatively reasonably), implementation of disposal plan (control measures clearly and effectively consider comprehensive, can take into account the surrounding pollution situation, confirm VOCWhether the value is up to standard hazardous waste compliance disposal and other content) and other links are closely linked, closely connected, and orderly disposal, so that all kinds of information transmission is accurate and timely, on-site disposal measures are standardized and effective, and the whole process of disposal is environmentally friendly and compliant, and the drill task is better completed. This live drill is fully prepared and runs smoothly, which exercises the participants in key positions, enhances the awareness of prevention and early emergency response of the participants and observers, and strengthens the emergency response ability of employees to deal with emergencies.
The self-control personnel found smoke from waste salt during monitoring,Immediately notify 403 of intercomOn-site inspectionThe squad leader rushed to the scene immediately and found a bag of waste salt smoking. He contacted the forklift to pick out the waste salt and reported it to the section chief.
When the section chief arrived at the scene, he ordered the personnel to break the waste salt and the forklift to transfer the surrounding dangerous waste.
The section chief started the emergency plan for hazardous waste fire, notified relevant leaders to participate in the rescue at the scene, and reported to the company's fire rescue team for support.
At this time, the broken waste salt began to catch fire. The workshop rescue team and the company's fire rescue team immediately used fire water bags to extinguish and control the scene. Others use firefighting sandbags to fence the surroundings.
After disposal, there is no open fire on the site, and immediately organize people to clean and collect the site.
After cleaning up, the alert group and environmental protection monitoring group reported to the commander. There were no casualties and the surrounding environment of the workshop was normal. Then the personnel assembly points will be gathered and the exercise will be over.
Finally, the personnel participating in the exercise and the observation personnel summarized the plan and commented on the reaction and disposal in the first time after the fire occurred. The exercise can achieve the expected purpose.
Related Annexes
Latest developments
Shandong anxin pharmaceutical co., ltd. entrusted Shandong unate environmental technology co., ltd. to compile the environmental impact report form of the laboratory and quality inspection central control room renovation project in November 2023, and obtained the environmental impact assessment approval through the municipal bureau review on April 19, 2024, with the approval number: jilihuan report form [2024] no 13.
Shandong anxin pharmaceutical co., ltd. entrusted Shandong unate environmental technology co., ltd. to compile the environmental impact report of 200 and 300 workshop technological transformation construction project in December 2021, and obtained the environmental impact assessment approval through the municipal bureau review on February 6, 2024, with the approval number: economic and environmental report [2024] no 4.
2023 Shandong Anxin Pharmaceutical Co., Ltd. Supplier Performance Evaluation Report
2023 Shandong Anxin Pharmaceutical Co., Ltd. Supplier Performance Evaluation Report
Environmental Information Disclosure Report of Shandong Anxin Pharmaceutical Co., Ltd. for 2023 (January 1-December 31)
Information Disclosure of Energy Saving and Carbon Reduction of Shandong Anxin Pharmaceutical Suppliers
