Shandong anxin pharmaceutical co., ltd. 1500m/d wastewater treatment expansion project trial operation publicity
Release time:
2023-02-10
Shandong anxin pharmaceutical co., ltd. 1500m/d wastewater treatment expansion project has commissioned Shandong unate environmental technology co., ltd. to prepare an environmental impact report in December 2020, and obtained an environmental impact assessment approval on March 5, 2021. the approval number is jili environmental report [2021] No. 1. the project will start construction in April 2021 and be completed in November 2022. the corresponding equipment and facilities have been completed. at present, sludge has been added, the joint trial run has been completed and is now scheduled to enter the trial run on February 13, 2023. The trial run time is from February 13, 2023 to July 13, 2023. It is hereby announced. During the publicity period, the public who have objections, questions or suggestions on the project can put forward opinions or suggestions to the EIA unit by letter, fax, e-mail, etc.
Construction unit: Shandong Anxin Pharmaceutical Co., Ltd.
Construction address: 10678 Wenliang Road, Dongjia Street, Licheng District, Jinan City
Contact: Zhang Hongwu
Contact number: 18705419451
Basic Projects of 1. Construction
The proposed project is located in the factory area of Qilu Pharmaceutical Dongjia Industrial Park, Dongjia Street, Licheng District, Jinan City, with a total investment of 92.9 million yuan and a total area of 9972.61m. The main building is a comprehensive equipment room, including 3 above-ground floors and 1 semi-underground pool. The proposed project is a reconstruction and expansion project, with a sewage treatment scale of 1500m/d, and the sewage treatment process is "pretreatment secondary biochemical treatment advanced treatment reclaimed water reuse treatment".
Construction of environmental protection facilities in 2.
Waste water:Part of the wastewater treated in this project is recycled to the plant area, and part is discharged into Dongjia Town Water Purification Plant through special pipelines for treatment, and finally discharged into Xiaoqing River. All indicators of the treated wastewater discharged from this project meet the standards of key protected areas in Tables 1 and 2 of "Discharge Standards for Water Pollutants in Watershed Part 3 Xiaoqing River Basin" (DB37/3416.3-2018), and "Notice of the General Office of Jinan Municipal People's Government on Improving the Implementation Standards for Discharge of Water Pollutants from Some Sewage Discharges Enterprises" (Ji Zheng Ban Zi [2011] No. 49) (of which: COD45mg mg/L, ammonia nitrogen 4.5mg/L) and "Chemical Synthesis Pharmaceutical Industry Water Pollutant Discharge Standard" (GB21904-2008) Table 2 and other standard requirements.
Exhaust gas:The high-concentration exhaust gas generated by this project is discharged up to the standard after being treated by "two-stage acid washing and one-stage alkali washing RTO of desulfurization tower", and the low-concentration exhaust gas is discharged up to the standard after being treated by "acid washing tower, alkali washing tower, water washing tower. The exhaust emission limit of this project shall be in accordance with the standards listed in Table 1 of the key control areas of the Emission Standard for Volatile Organic Compounds and Odor Pollutants from Sewage Treatment Plants (Stations) of Organic Chemical Enterprises (DB37/3161-2018), the Emission Standard for Air Pollutants of Pharmaceutical Industry (GB37823-2019 -2018) and the Comprehensive Emission Standard for Regional Air Pollutants of Shandong Province (DB37/2376-2019).
Solid waste:In addition to general solid waste, the solid waste generated by this project is mainly hazardous waste such as sewage treatment station sludge and desulfurization impurities. Hazardous waste shall be strictly transferred and disposed.
Noise:The main noise sources of the Project are mainly from pumps, fans and air compressors of the sewage treatment station. According to the monitoring of existing projects during this EIA period, the noise at the boundary of Dongjia Base meets the requirements of Class 2 of the Environmental Noise Emission Standard for Industrial Enterprises (GB12348-2008).
Related Annexes
Latest developments
Shandong anxin pharmaceutical co., ltd. entrusted Shandong unate environmental technology co., ltd. to compile the environmental impact report form of the laboratory and quality inspection central control room renovation project in November 2023, and obtained the environmental impact assessment approval through the municipal bureau review on April 19, 2024, with the approval number: jilihuan report form [2024] no 13.
Shandong anxin pharmaceutical co., ltd. entrusted Shandong unate environmental technology co., ltd. to compile the environmental impact report of 200 and 300 workshop technological transformation construction project in December 2021, and obtained the environmental impact assessment approval through the municipal bureau review on February 6, 2024, with the approval number: economic and environmental report [2024] no 4.
2023 Shandong Anxin Pharmaceutical Co., Ltd. Supplier Performance Evaluation Report
2023 Shandong Anxin Pharmaceutical Co., Ltd. Supplier Performance Evaluation Report
Environmental Information Disclosure Report of Shandong Anxin Pharmaceutical Co., Ltd. for 2023 (January 1-December 31)
Information Disclosure of Energy Saving and Carbon Reduction of Shandong Anxin Pharmaceutical Suppliers